कैलकुलेटर
फाउंडेशन कैलकुलेटर
Ghar ki foundation ke liye — PCC bed aur footing — cement bags, reti, aggregate aur ₹ cost, m ya ft mein।
इनपुट
इकाई प्रणाली
Footing ke neeche levelling course (aksar 75–150 mm)।
परिणाम
Kul concrete volume
1.98m³
Kul concrete volume
69.92cft
Volume breakdown
Footing volume
1.62m³
PCC bed volume
0.36m³
50 kg cement bags
15bags
Reti required
29.90cft
Aggregate required
59.80cft
Material cost ka anuman
₹10,934
गणना कैसे होती है
सूत्र
- Imperial ho to ft → m convert
- footing_volume = length × width × footing_depth
- pcc_volume = length × width × pcc_thickness
- footing_volume ko selected grade ratio se split → cement, reti, aggregate
- pcc_volume ko M10 ratio se split → cement, reti, aggregate
- Cement volumes combine karein → bags; reti/agg combine → cft (× 35.3147)
- cost = bags × ₹/bag + (reti_cft + agg_cft) × ₹/cft
मान्यताएँ
- Foundation ko PCC bed + footing maana — dono length × width rectangles.
- Sabhi dimensions ke liye Metric (m) ya Imperial (ft) chunein।
- PCC (levelling) bed hamesha M10 (1:3:6) — footing aapke selected grade se।
- Material split har layer ke liye grade mix aur dry volume × 1.54 se।
- Cement bags 50 kg standard Indian bags, PCC + footing combined।
- Cost = (cement bags × ₹/bag) + ((reti + aggregate) cft × ₹/cft)।
- Excavation, steel, formwork, mazdoori shamil nahi — grade aur depth structural drawing se confirm karein।