MixCalc

कैलकुलेटर

फुटिंग कैलकुलेटर

Strip ya pad footing ke liye cement bags, reti, aggregate aur ₹ cost — length × width × depth m ya ft mein।

इनपुट

इकाई प्रणाली

परिणाम

Wet concrete volume

1.62

Wet concrete volume

57.21cft

50 kg cement bags

14bags

Reti required

24.03cft

Aggregate required

48.06cft

Material cost ka anuman

₹9,565

गणना कैसे होती है

सूत्र

  1. Imperial ho to ft → m convert
  2. wet_volume = length × width × depth
  3. dry_volume = wet_volume × 1.54
  4. Grade ratio se split → cement, reti, aggregate
  5. reti/agg cft mein (× 35.3147)
  6. cost = bags × ₹/bag + (reti_cft + agg_cft) × ₹/cft

मान्यताएँ

  • Footing ko simple rectangle maana (length × width × depth)।
  • Teen dimensions ke liye Metric (m) ya Imperial (ft) chunein।
  • Material split selected grade mix aur dry volume × 1.54 se।
  • Cement bags standard Indian 50 kg।
  • Cost = (cement bags × ₹/bag) + ((reti + aggregate) cft × ₹/cft)।
  • Steel, formwork, mazdoori shamil nahi — grade structural drawing se confirm karein।

और जानें